Chandler Elementary School
Sunviewer.net™ Solar Energy & Weather Information
This 2.4 KW installation at Chandler School started producing energy in August 2009.

The panels were made possible by an 18 month campaign led by Sustainable Duxbury. As a result 211 households and businesses contributed to the New England Wind Fund, making the town eligible for the solar array funded by the Massachusetts Technology Collaborative and the Renewable Energy Trust.

In addition to this web based data display Duxbury students in grades 4-12 can access real time renewable energy data displays at their schools thanks to a generous contribution by the Island Creek Foundation. As a result of teacher training in the spring of 2009 this data will integrated into the science and Mathematics curricula during the 2009-2010 school year.

View System Details

View Educational Activities

[ Home ]
 
System Details:

Total System Power:  2.4 kW

Solar PV Array:  12 Evergreen ES-A-200 modules

Inverter:  Solectria PVI2500-208

Azimuth:  180°
Elevation: 42° 

Latitude:  42°02'14" N
Longitude:  70°44'18" W 

Installer:  Nexamp, Inc.
                 21 High St, Ste 209
                 North Andover, MA 01845
                 978-688-2700

Heliotronics, Inc.  Franklin™ with
Sunviewer.net™ Internet display

Chandler Elementary School
93 Chandler Street
Duxbury, MA 02332